Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly. At materialtree.com, you can also …
all cost, laying of concrete, watering, curing, conveyance, T & P, royalties, taxes of all materials required for the work, Scaffolding & labour charges etc complete as per direction of Engineer-in charge 5 cum 10 RCC ( 1:1.5:3 ) 12 to 20mm graded HG Chips Reinforced cement concrete(1:1.5:3) for all type of work using 12 to 20mm graded hard ...
In this Rate Analysis of RCC calculation of material, labor, wastage, and other charges in rate analysis. Also, read: Rate Analysis of Brick Masonry Material calculation in Rate Analysis like Cement, sand, aggregate, and reinforcement Cement calculation. Dry Cement volume = 1.25 convert Wet cement.(The concrete mortar dry volume of concrete decrease volume of dry cement mortar, so 1.25 time of ...
Advantages of Reinforced Concrete as a Structural Material Reinforced concrete is the most important material available for construction. 1. It has considerable compressive strength per unit cost compared with most other materials. 2. Reinforced concrete has great resistance to …
Analysis of rates for labour and material. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc.,
- Building Code Requirements for Reinforced Concrete (ACI 318-83). - Formwork for Concrete (ACI SP-4). - Recommended Practice for Concrete Formwork (ACI 347-78). - Safety Requirements for Concrete and Masonry Work (ANSI A10.9-1983). - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens (ASTM C39-86).
20mm Aggregate 40km Rs.75/CUM Cement Rs.165/ Bag at site of work Vibrator charges Rs.15/CUM Mixer Machine hire charges Rs.100/CUM Labor for 10CUM of concrete 3.5Nos Mason II Class Rs. 150/each/day 5.5Nos Mazdoor I Class Rs.100/each/day 16Nos Mazdoor II Class Rs.75/each/day Material Quantity in 10 CuM of 1:2:4 RCC Mix Items UoM Calculation Value ...
CHAPTER 16 - RCC AND FORM WORK Notes: - 1. Rates include- (a) Lead up to 100 m for all materials for all items. (b) Cost of all material including cost of water. (c) All lifts for all materials unless specified otherwise. (d) Mixing of concrete in mixer. (e) Mechanical vibration of concrete. (f) Finishing to all surfaces of R.C.C. (g) Cost of ...
The objective function C, in Eq. (1), describes the cost of a reinforced concrete structure and includes, in order of appearance, forms in place cost, concrete materials cost, concrete placement and vibrating including labor and equipment cost, and reinforcement in place using A615 Grade 60 steel including accessories and labor cost.
how many labour is required for 1cum of concrete? .. Answer / sathesh.b.nama 3CUM/DAY/ MASON WITH 1 HELPER CAN DO RCC & 5CUM/DAY/MASON WITH 1 HELPER CAN DO PCC..IS NORMAL PRODUCTIVE NORMS OFA A MASON NOW-A-DAYS
b) Cement concrete work per 2.83 cum (100cuft) laying cement concrete – 2 beldars, 3 mazdoors, ¾ bhisti and ¼ mason, can do 2.83 cum (100 cuft) per day. c) R C C work:- 1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1½ Bhisti and ½ mason can do 2.83 cum (100cuft) per day.
1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1½ Bhisti and ½ mason can do 2.83 cum (100cuft) per day. 2) Centering and shuttering for flat surfaces – 4 beldars and 4 carpenters (II class) can do 9.6sqm(96sqft) per day.
Following four materials are required for making R.C.C.: 1. Cement 2. Aggregates 3. Steel 4. Water. 1. Cement: Before the introduction of ordinary Portland cement, the lime was used as a cementing material. Most of the cement concrete work in building construction is done with …
Answer: I shall give the specifications and quantities of materials and labour required for TEN CUBIC METER and you convert for cubic feet:- Brickwork in cement mortar 1:5 [one of cement and five of sand ] in foundations and basement using second class ground moulded chamber burnt bricks of size...
It is a reinforced concrete framed structure consisting of G +2 with adequate ... wash and then colouring as required. All the joiners and iron ... II Laying of PCC M10 (1:3:6) using 40mm HBG metal including cost and conveyance of all materials and labour charges etc., a. Mechanical & Security room 4*1 1.00 1.00 0.15 6.00 16.70 b. Toilets 2*1 1 ...
P.C.C. 1:3:6 (M.10) Cum 2.00 4071.98 8143.95 3 Providing & casting in situ cement concrete of required grade of trap / granite / quartzite / gneiss metal for RCC work mentioned below as per detailed design & drawings or as directed, including still centering, plywood / steel formwork, compaction, finishing, uneven & honeycomb
For a basic project in zip code 47474 with 120 square feet, the cost to Install a Cement Slab starts at $7.73 - $9.49 per square foot*. Actual costs will depend on job size, conditions, and options. To estimate costs for your project: 1. Set Project Zip Code Enter the Zip Code for the location where labor is hired and materials purchased.
Reinforced Cement Concrete (RCC) Definition of Reinforced Cement Concrete Reinforced Cement Concrete (RCC) is a composite building material consisting of structural concrete reinforced with a reinforcing material like steel. The most common reinforcement used is steel, due to its complimentary properties and it is called steel reinforced cement concrete or simply Reinforced Cement Concrete ...
416 kg, Water- 175 Liters, Concrete Admixture (FOSROC or PEDLITE)- 1.5 Lit) for all RCC works including cost and conveyance of all materials and cement to work site. The rates including all cost and labour charges for mixing the concrete, laying, vibrating, watering with all leads for good water and curing and compacting the concrete and all other
Advantages of Reinforced Concrete. Reinforced concrete has a high compressive strength compared to other building materials. Due to the provided reinforcement, reinforced concrete …
🕑 Reading time: 1 minuteToday we will see how to prepare rate analysis for Reinforced Concrete (RCC) work. First step to rate analysis is the estimation of labour, materials, equipments and miscellaneous items for particular quantity of reinforced concrete. The second step is to determine the component of structure for which the RCC rate analysis […]
Quantity of Materials required for different items of works Name of work Per Unit Materials Quantity Brickwork 10 cum 19x9x9 5000nos Dry cement mortar 3.5cum Half brick 100 sqm 19x9x9 5000nos Random rubble masonry 10 cum stone 12.5cum Dry cement mortar 4.2cum Ashlar masonry 10 cum stone 12.5cum Brick soling 10 sqm 19x9x9 425nos Brick on edge ...
materials for different mix ratio quantity estimation of materials is essentially required in any construction works and quantity of materials depend on the mix proportions of the concrete in our previous article we have already discussed how to calculate bricks in a wall today we will discuss how to calculate quantities of materials, labour ...
Answer (1 of 3): Mason 3.7 days Labour 35 days Water carrier 13.9 days Bar bender 1 day/ 100 kg Mixer operator-0.72 days Vibrator operator0.72 days Day means 8 hours with lunch break of …
into the labor, material and equipment costs. Thus type of estimate need to have a design available to get such required details. This chapter introduces the details of estimating labor, equipment and material costs as the basis for detailed cost estimate of construction projects. 4.1 …
For ExampleFor 10 cum of concrete in a column considering 2.5% of steel, the quantity of steel would be10 cum concrete in a column will have 0.25 cum of steel (considering steel volume of 2.5%) 0.25 cum will weigh, 0.25*7850 = 1962.5 kg (as density of steel 7850 kg/cum) For 10cum concrete the steel required is 1962.5 kg
In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the material calculation for ...
namely, Material, Labour, Machinery and Overheads. There are no limitations on ... RCC M20 Rcc M20 (1:1.5:3) concrete in Ordinary Works 200.000 cu.mt 4436.00 887200.00 ... easy to use and so special training is required. For more details, Get in touch with us Today ! Title: Microsoft Word - RateAnlyWriteupColour3page.doc ...
Prepare the Analysis of Rate for 10 cum of Cement Concrete 1:2:4 from the following data: Labour for 10 cum Mason: 1 no. @Rs. 300 per day Labour: 15 no. @Rs. 200 per day Water Man: 2 no. @ Rs. 250 per day. Cost of Material Cement: Rs. 300 per Bag
uch has been said about concrete and its wide range of usage in the construction field, but all too little has been said of the cost of labor for the installa-tion of this important material. It is absurd simply to say that a unit or block of work is worth so many dollars be - cause it …
10 cum 253.87 11 11.1 sqm 18.40 11.2 sqm 23.04 Description of Item Concrete Work Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1,
Labor Requirement for Various Construction Works. There are different types of labors that are required for the construction: Skilled labor. Semi-skilled labor. Unskilled labor. All these types of labors have different skills and different salaries. Their optimum use in every work in construction is essential to minimize the construction cost.